Site management, PV power plant Krettnich
12 MWp,
Germany more
Site management, PV power plant Krettnich
Construction management for a utility scale PV power plant
Site project managment and construction management has been executed for the 12 MWp project in Saarland. G2KV executed the site management and final acceptance procedures.
Power: 12 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2023, Krettnich
2023
Site management, PV power plant Rosspile, Co. Wexford
138 MWp,
Irland more
Site management, PV power plant Rosspile, Co. Wexford
Construction management for a utility scale PV power plant
Site project managment and construction management has been executed for the 138 MWp project in Ireland. G2KV executed the site management and final acceptance procedures.
Power: 138 MWp
Client: ibvogt GmbH
Bauleitung, 2023, Rosspile
2023
Site management, PV power plant Döllen
154 MWp,
Germany more
Site management, PV power plant Döllen
Construction management for a utility scale PV power plant
Site project managment and construction management has been executed for the 154 MWp project in Brandenburg.
Power: 154 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2023, Döllen
2022
Site management, PV power plant Wallhausen
10,6 MWp,
Germany more
Site management, PV power plant Wallhausen
Project / site / construction management for a utility scale PV power plant
For the project Walhausen with 12 MWp, the contracting, construction management and project management were carried out. Additionally, the projects planning permission process was supervised.
Power: 10,6 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2022, Wallhausen
2022
Site management, PV power plant Gottesgabe
150 MWp,
Germany more
Site management, PV power plant Gottesgabe
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 150 MWp was carried out in Döllen (germany). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 150 MWp
Client: EnBW
Gutachten, 2022, Gottesgabe
2022
Site management, PV power plant Alttrebbin
150 MWp,
Germany more
Site management, PV power plant Alttrebbin
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 154 MWp was carried out in Alttrebin (Germany). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 150 MWp
Client: EnBW
Gutachten, 2022, Alttrebbin
2022
Site management, PV power plant Hepberg
10,6 MWp,
Germany more
Site management, PV power plant Hepberg
Site construction management has been executed for the 10,6 MWp project in Bavaria.
Site construction management has been executed for the 3,6 MWp project in Lockweiler (Saarland).
Power: 10,6 MWp
Client: EON
Bauleitung, 2022, Hepberg
2021
Site management, PV power plant Handenberg II
3,3 MWp,
Germany more
Site management, PV power plant Handenberg II
Construction management for a utility scale PV power plant
Site construction management has been executed for the 3,3 MWp extension of an existing PV power plant in Saarland. The site is equipped with 2 battery storage containers with a total capacity of 3500 kWh. G2KV
Power: 3,3 MWp
Client: CleanSource Construktion GmbH
Bauleitung, 2021, Handenberg
2021
Site management, PV power plant Handenberg
9,6 MWp,
Germany more
Site management, PV power plant Handenberg
Construction management for a utility scale PV power plant
Site construction management has been executed for the 9,6 MWp project in Hadenberg (Saarland).
Power: 9,6 MWp
Client: CleanSource Construktion GmbH
Bauleitung, 2021, Handenberg
2021
Site management, PV power plant Zweibrücken
0,75 MWp,
Germany more
Site management, PV power plant Zweibrücken
Construction management for a utility scale PV power plant
Site construction management has been executed for the 0,75 MWp project in Zweibrücken.
Power: 0,75 MWp
Client: MKG - Montagebau Karl Göbel
Bauleitung, 2021, Zweibrücken
2021
Site management, PV power plant Pescheid
3,1 MWp,
Germany more
Site management, PV power plant Pescheid
Construction management for a utility scale PV power plant
Site construction management has been executed for the 3,1 MWp project in Pescheid (Saarland).
Power: 3,1 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2021, Pescheid
2021
Site management, PV power plant Henschleben
7,0 MWp,
Germany more
Site management, PV power plant Henschleben
Construction management for a utility scale PV power plant
Site construction management has been executed for the 3,6 MWp project in Henschleben (Thuringia).
Power: 7,0 MWp
Client: MKG - Montagebau Karl Göbel
Bauleitung, 2021, Henschleben
2021
Site management, PV power plant Lockweiler
3,6 MWp,
Germany more
Site management, PV power plant Lockweiler
Construction management for a utility scale PV power plant
Site construction management has been executed for the 3,6 MWp project in Lockweiler (Saarland).
Power: 3,6 MWp
Client: CleanSource Construktion GmbH
Bauleitung, 2021, Lockweiler
2021
Site management, PV power plant, Weidenwang
10,0 MWp,
Germany more
Site management, PV power plant, Weidenwang
Construction management for a utility scale PV power plant
Site construction management has been executed for the 10 MWp project in Bavaria.
Power: 10,0 MWp
Client: EON
Bauleitung, 2021, Weidenwang
2021
Site management, PV power plant Altenschwand
3,2 MWp,
Germany more
Site management, PV power plant Altenschwand
Construction management for a utility scale PV power plant
Site construction management has been executed for the 3,2 MWp project in Bavaria.
Power: 3,2 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2021, Altenschwand
2020
Site management, Frankendorf
8,3 MWp,
Germany more
Site management, Frankendorf
Construction management for a utility scale PV power plant
Site construction management has been executed for the 8,3 MWp project in Sacony.
Power: 8,3 MWp
Client: MKG
Bauleitung, 2020, Frankendorf
2020
Site management, PV power plant Bahra
0,75 MWp,
Germany more
Site management, PV power plant Bahra
Construction management for a utility scale PV power plant
Site construction management has been executed for the 0,75 MWp project in Sacony.
Power: 0,75 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2020, Bahra
2020
Site management, Vietnam
5,75 MWp,
Vietnam more
Site management, Vietnam
site construction management for a utility scale PV power plant
g2kv has been subcontracted by CleanSourceConstructions GmbH to conduct an on-site technical monitoring as well as a technical revision of the photovoltaic power plant on the roofs of the Nguyen Cuong industrial estate in the Dong Nai province approx. 40 km of Saigon. The rooftop installation was erected by Sonnenklar Energie Ltd. (SKE) with its subcontractor Solartek Ltd.
The following activities were conducted:
Check of the planning - plant conception and dimensioning
Check of the installation (on-site, remote),
Check of plant parts (on-site, remote),
Conducting a defect survey according (remote),
Formulation of improvement requirements during construction,
Recommendations for and random check of the documentation
Power: 5,75 MWp
Client: CleanSource Construction
ProjectmanagementBauleitung, 2020, Nguyen Cuong, Dong Nai Province, Saigon
2020
Project management, Zietlitz
78,0 MWp,
Germany more
Project management, Zietlitz
Project / site / construction management for a utility scale PV power plant
For the project Zietlitz (GER) with 78 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 78,0 MWp
Client: Goldbeck Solar GmbH
BauleitungProjectmanagement, 2020, Zietlitz
2020
Site management, Schweigersdorf
10,0 MWp,
Germany more
Site management, Schweigersdorf
Construction management for a utility scale PV power plant
Site/construction management has been executed for the 10 MWp project in Bavaria.
Power: 10,0 MWp
Client: EON
Bauleitung, 2020, Schweigersdorf
2020-2013
Operation and Maintenance, Erfurt,
2,0 MWp,
Germany more
Operation and Maintenance, Erfurt,
Operations and Maintenance
A continuous O&M - operation and maintenance management, including reporting, will be carried out for the 2.0 MWp PV plant in Erfurt.
Power: 2,0 MWp
Client: Energiepark Erfurt HB GmbH
Betriebsführung, 2020-2013, Erfurt
2020-2015
Operation and Maintenance, Werdau
0.260 MWp,
Germany more
Operation and Maintenance, Werdau
Operations and Maintenance
A continuous O&M - operation and maintenance management, including reporting, will be carried out for the 0.260 MWp PV plant in Erfurt.
Power: 0.260 MWp
Client: Energiepark Erfurt HB GmbH
Betriebsführung, 2020-2015, Erfurt
2020-2017
Operations and Maintenance, Cooper House,
5,0 MWp,
England more
Operations and Maintenance, Cooper House,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Goddards Green.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2017, Cooper House
2020-2017
Operations and Maintenance, Goddards Green,
5,0 MWp,
England more
Operations and Maintenance, Goddards Green,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Goddards Green.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2017, Goddards Green
2020-2017
Operations and Maintenance, Newby West,
5,0 MWp,
England more
Operations and Maintenance, Newby West,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Newby West.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2017, Newby West
2020-2019
Operations and Maintenance, Southwick
7.998 MWp,
United Kingdom more
Operations and Maintenance, Southwick
Operations and Maintenance
A continuous O&M - operation and maintenance management, was carried out for the 7.998 MWp PV plant in Southwick.
Power: 7.998 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2019, Southwick
2020-2017
Operations and Maintenance, Twemlows South
5,0 MWp,
England more
Operations and Maintenance, Twemlows South
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Twemlows South.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2017, Twemlows
2020-2017
Operations and Maintenance, Twemlows North
5,0 MWp,
England more
Operations and Maintenance, Twemlows North
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Twemlows North.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2017, Twemlows
2020-2018
Operations and Maintenance, Wambrook
5,0 MWp,
England more
Operations and Maintenance, Wambrook
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Wambrook.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2020-2018, Wambrook
2017
Operations and Maintenance, West Field
5,0 MWp,
England more
Operations and Maintenance, West Field
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in West Field.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2017, West Field
2019-2018
Operations and Maintenance, East Farm
4.998 MWp,
United Kingdom more
Operations and Maintenance, East Farm
Operations and Maintenance
A continuous O&M - operation and maintenance management, was carried out for the 4.998 MWp PV plant in East Farm.
Power: 4.998 MWp
Client: IB Vogt GmbH
GutachtenBetriebsführung, 2019-2018, East Farm
2019-2018
Operations and Maintenance, Galton Manor
4.996 MWp,
United Kingdom more
Operations and Maintenance, Galton Manor
Operations and Maintenance
A continuous O&M - operation and maintenance management, was carried out for the 4.996 MWp PV plant in East Farm.
Power: 4.996 MWp
Client: IB Vogt GmbH
GutachtenBetriebsführung, 2019-2018, Galton Manor
2019-2018
Operations and Maintenance, Holly Farm
4.998 MWp,
United Kingdom more
Operations and Maintenance, Holly Farm
Operations and Maintenance
A continuous O&M - operation and maintenance management, was carried out for the 4.998 MWp PV plant in Holly Farm.
Power: 4.998 MWp
Client: IB Vogt GmbH
Betriebsführung, 2019-2018, Holly Farm
2019-2017
Operations and Maintenance, Ring o Bells,
5,0 MWp,
England more
Operations and Maintenance, Ring o Bells,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Ring o Bells.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2019-2017, Ring o Bells
2018-2017
Operations and Maintenance, Cheshire Coppice,
5,0 MWp,
England more
Operations and Maintenance, Cheshire Coppice,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Cheshire Coppice.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2018-2017, Cheshire Coppice
2018-2017
Operations and Maintenance, Strettington,
5,0 MWp,
England more
Operations and Maintenance, Strettington,
Operations and Maintenance
A continuous O&M - operation and maintenance management, will be carried out for the 5.0 MWp PV plant in Strettington.
Power: 5,0 MWp
Client: IB Vogt GmbH
Betriebsführung, 2018-2017, Strettington
2019
Project management, Wriezen
6,3 MWp,
Germany more
Project management, Wriezen
Project / site / construction management for a utility scale PV power plant
For the project Wriezen (GER) with 6,3 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 6,3 MWp
Client: Goldbeck Solar GmbH
ProjectmanagementBauleitung, 2019, Wriezen
2019
Project management, Herzhorn
4,0 MWp,
Germany more
Project management, Herzhorn
Project / site / construction management for a utility scale PV power plant
For the project Herzhorn (GER) with 0.4 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 4,0 MWp
Client: Goldbeck Solar GmbH
ProjectmanagementBauleitung, 2019, Herzhorn
2019
Site management, CSC-Dornheim
0,75 MWp,
Deuschland more
Site management, CSC-Dornheim
Construction management for a utility scale PV power plant
Electrical construction management has been executed for the 0,75 Mwp project in Dornheim (GER).
Power: 0,75 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2019, Dornheim
2019
Expertise, Coleford
3.4 MWp,
United Kingdom more
Expertise, Coleford
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.4 MWp was carried out in Coleford (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 3.4 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2019, Coleford
2019
Expertise, Monksham
10.7 MWp,
United Kingdom more
Expertise, Monksham
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10.7 MWp was carried out in Monksham (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 10.7 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2019, Monksham
2019
Site management, EON-Hafenlohr
Deuschland more
Site management, EON-Hafenlohr
Construction management for a utility scale PV power plant
Electrical construction management has been executed for the 10.0 Mwp project in Hafenlohr (GER).
Client: EON
Bauleitung, 2019, Hafenlohr
2019
Site management, Telzer Plan
11.5 MWp,
Deuschland more
Site management, Telzer Plan
Construction management for a utility scale PV power plant
Electrical construction management has been executed for the 11.5 Mwp project near Mittenwalde (GER).
Power: 11.5 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2019, Telzer Plan
2019
Site management, Hinterste Plan
14.5 MWp,
Deuschland more
Site management, Hinterste Plan
Construction management for a utility scale PV power plant
Electrical construction management has been executed for the 14.5 Mwpproject near Mittenwalde (GER).
Power: 14.5 MWp
Client: CleanSource Construction GmbH
Bauleitung, 2019, Hinterste Plan
2019
Project management, Site management, Enni-Moers
3.795 MWp,
Deuschland more
Project management, Site management, Enni-Moers
Project / site / construction management for a utility scale PV power plant
For the project Mörs (GER) with 3.795 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 3.795 MWp
Client: Goldbeck Solar
ProjectmanagementBauleitung, 2019, Moers
2019
Site/construction management, LB Vietnam
1.56 MWp,
United Kingdom more
Site/construction management, LB Vietnam
Construction management for a utility scale roof top PV power plant
Site/construction management has been executed for the 1.56 MWp roof top project near Saigon.
Power: 1.56 MWp
Client: CS - Construction
Bauleitung, 2019, Nhon Trach
2019
Site/construction management, LB Vietnam
2.34 MWp,
United Kingdom more
Site/construction management, LB Vietnam
Construction management for a utility scale roof top PV power plant
Site/construction management has been executed for the 2.34 MWp roof top project near Saigon.
Power: 2.34 MWp
Client: CS - Construction
Bauleitung, 2019, Tam Phuoc
2019
Project management, Huntingford
7.681 MWp,
United Kingdom more
Project management, Huntingford
Projectmanagement for the removal of corrosion of transformer stations of PV power plants
For this project with 7.681 MWp the corrosion treatment of the transformators was managed. To carry out the corrosion treatment, the transformators were taken out of the station by crane and were put back in place afterwards.
Power: 7.681 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2019, Huntingford
2019
Project management, Littlewood
4.997 MWp,
United Kingdom more
Project management, Littlewood
Projectmanagement for the removal of corrosion of transformer stations of PV power plants
For this project with 4.997 MWp the corrosion treatment of the transformators was managed. To carry out the corrosion treatment, the transformators were taken out of the station by crane and were put back in place afterwards.
Power: 4.997 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2019, Littlewood
2019
Project management, Marchington
4.998 MWp,
United Kingdom more
Project management, Marchington
Projectmanagement for the removal of corrosion of transformer stations of PV power plants
For this project with 4.998 MWp the corrosion treatment of the transformators was managed. To carry out the corrosion treatment, the transformators were taken out of the station by crane and were put back in place afterwards.
Power: 4.998 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2019, Marchington
2019
Project management, Tengore
3,619 MWp,
United Kingdom more
Project management, Tengore
Projectmanagement for the removal of corrosion of transformer stations of PV power plants
For this project with 3.619 MWp the corrosion treatment of the transformators was managed. To carry out the corrosion treatment, the transformators were taken out of the station by crane and were put back in place afterwards.
Power: 3,619 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2019, Tengore
2019
Project management, Hurcott
7.998 MWp,
United Kingdom more
Project management, Hurcott
Operations and Maintenance
For this project with 9.996 MWp the corrosion treatment of the transformators was managed. To carry out the corrosion treatment, the transformators were taken out of the station by crane and were put back in place afterwards.
Power: 7.998 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2019, Hurcott
2018
Expertise, Sömmerda
0.616 MWp,
Germany more
Expertise, Sömmerda
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 0.616 MWp was carried out in Sömmerda (GER). In particular, a visual inspection of all components and their assambly, a final report as well as a nonconformity report was prepared.
Power: 0.616 MWp
Client: Feuerstein companies
Gutachten, 2018, Sömmerda, Thüringia
2018
Feasibility study, University Hospital Jena
1,5 MWp,
Germany more
Feasibility study, University Hospital Jena
Feasibility study for the construction of a PV system at the university hospital in Jena
For this project with 29,76 kWp in Jena, (Germany) the feasibility of an economically worthwhile operation of a photovoltaic system was reviewed.
Power: 1,5 MWp
Client: University Hospital Jena
Planung, 2018, Jena, Thüringia
2018
Expertise, Rittersdorf
1.5 MWp,
Germany more
Expertise, Rittersdorf
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 1.5 MWp was carried out in Rittersdorf (GER). In particular, a visual inspection of all components and their assambly, a final report as well as a nonconformity report was prepared.
Power: 1.5 MWp
Client: Energiegenossenschaft Rittersdorf
Gutachten, 2018, Rittersdorf, Thüringia
2018
Advanced education, Bad Staffelstein
Germany more
Advanced education, Bad Staffelstein
2 day course "skilled electrian for specific tasks"
The 2 day course "skilled electrian for specific tasks" has been executed on behalf of IBC Solar AG. The final exam was included.
Client: DGS LV Thüringen e.V.
Schulungen, 2018, Bad Staffelstein
2018
Advanced education, Bad Staffelstein
Germany more
Advanced education, Bad Staffelstein
3 day course "electrically trained person" and H&S
The 3 day course "electrically trained person" and H&S has been executed on behalf of IBC Solar AG. The final exam was included.
Client: DGS LV Thüringen e.V.
Schulungen, 2018, Bad Staffelstein
2018
Planning, Hirschberg
MWp,
Germany more
Planning, Hirschberg
Electrical planning of solar parks
g2kv GmbH has been involved in the electricl planning of several utilit scale PV power plants worldwide.
Power: MWp
Client: IB Vogt GmbH
Planung, 2018, Hirschberg
2018
Expertise, Sättelstädt
0,75 MWp,
Germany more
Expertise, Sättelstädt
Technical expertise of a utility scale PV power plant
An expertise regarding mechanical acceptance of the 750 kWp PV power plant was elaborated.
Power: 0,75 MWp
Client: maxx solar & energie Gmbh & Co.KG
Gutachten, 2018, Sättelstädt
2018
Technical expertise and valuation report, Drebkau
0,06 MWp,
Germany more
Technical expertise and valuation report, Drebkau
Technical expertise of a utility scale PV power plant including valuation reporting
For these 0,06 kWp system in Drebkau (GER) was carried out a due diligence with the aim to calculate the real vallue.
Power: 0,06 MWp
Client: Private Client
Gutachten, 2018, Drebkau
2018
Planning, Derendingen
1,0 MWp,
Switzerland more
Planning, Derendingen
Coordination of punchlist rectification works and commissioning of the plant
The punchlist rectification works were coordinated by the g2kv GmbH. The commissioning has been coordinated.
Power: 1,0 MWp
Client: Goldbeck Solar GmbH
Planung, 2018, Derendingen
2018
Expertise, Upper Huntingford
7,7 MWp,
United Kingdom more
Expertise, Upper Huntingford
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7,7 MWp was carried out in Upper Huntingford (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 7,7 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2018, Upper Huntingford
2018
Expertise, Whitelake
5,0 MWp,
United Kingdom more
Expertise, Whitelake
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5.0 MWp was carried out in Whitelake (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 5,0 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2018, Whitelake
2018
Expertise, Pylle
5,0 MWp,
United Kingdom more
Expertise, Pylle
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5.0 MWp was carried out in Pylle (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 5,0 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2018, Pylle
2018
Expertise, Oakland
5,0 MWp,
United Kingdom more
Expertise, Oakland
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5.0 MWp was carried out in Oakland (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 5,0 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2018, Oakland
2018
Expertise / damage assessment Churchtown
MWp,
United Kingdom more
Expertise / damage assessment Churchtown
Expertise to investigate damage /fire incident root causes
Investigation of root causes and development of solutions
Power: MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2018, Tamar
2018
Planning / Testing / troubleshooting, Aswan - "Infinity"
64,0 MWp,
Egypt more
Planning / Testing / troubleshooting, Aswan - "Infinity"
Commissioning of a tracker system and troubleshooting
The commissioning and troubleshooting has been organiszed and executed for the 64 MWp project in the Benban solar area.
Power: 64,0 MWp
Client: IB Vogt GmbH
BauleitungPlanung, 2018, Infinity
2018
Site management, Aswan - "Phönix"
64,0 MWp,
Egypt more
Site management, Aswan - "Phönix"
Electrical construction management for a utility scale PV power plant
Electrical construction management has been executed for the 64 MWp project in the Benban Solar area.
Power: 64,0 MWp
Client: IB Vogt GmbH
Bauleitung, 2018, Aswan
2018
Project management, Aswan - "BSEP"
64,0 MWp,
Egypt more
Project management, Aswan - "BSEP"
Project / site / construction management for a utility scale PV power plant
Site / construction management has been executed for the 64 Mwp project in the Benban Solar area close to Aswan.
Power: 64,0 MWp
Client: IB Vogt GmbH
ProjectmanagementBauleitung, 2018, Aswan
2018
Project management, Marienberg II
4,0 MWp,
Germany more
Project management, Marienberg II
Project / site / construction management for a utility scale PV power plant
For the project Marienberg (GER) with 0.4 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 4,0 MWp
Client: Goldbeck Solar GmbH
ProjectmanagementBauleitung, 2018, Marienberg II
2018
Project management, Falkenfelde
8,775 MWp,
Germany more
Project management, Falkenfelde
Project / site / construction management for a utility scale PV power plant
For the project Frankenfelde (GER) with 8.8 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 8,775 MWp
Client: Goldbeck Solar GmbH
ProjectmanagementBauleitung, 2018, Falkenfelde
2018
Project management, Kunersdorf II
2,5 MWp,
Germany more
Project management, Kunersdorf II
Project / site / construction management for a utility scale PV power plant
For the project Kunersdorf (GER) with 2.5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the projects planning permission process was supervised.
Power: 2,5 MWp
Client: Goldbeck Solar GmbH
ProjectmanagementBauleitung, 2018, Kunersdorf
2017
Advanced education, Ziegenrück, Frankenfelde
Germany more
Advanced education, Ziegenrück, Frankenfelde
1 day course PV project on agricultural premises
The training "PV for farmers" was carried out by g2kv for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2017, Ziegenrück, Frankenfelde
2017
Technical expertise and valuation report, Vöhringen
0,34 MWp,
Germany more
Technical expertise and valuation report, Vöhringen
Technical expertise of a utility scale PV power plant including valuation reporting
For these 340 kWp system in Vöhringen (GER) was carried out a due diligence with the aim to calculate the real vallue.
Power: 0,34 MWp
Client: Goldbeck Betonelemente Süd GmbH
Gutachten, 2017, Vöhringen
2017
Advanced education, Johannesburg
South Africa more
Advanced education, Johannesburg
3 day course Planning and installation of utility scale PV power plants
The training "design and planning of PV Power Plant" was carried out by g2kv for the maxx solar academy.
Client: DGS LV Thüringen e.V.
Schulungen, 2017, Johannesburg
2017
Technical expertise and valuation report, Erfurt
0,34 MWp,
Germany more
Technical expertise and valuation report, Erfurt
Technical expertise of a utility scale PV power plant including valuation reporting
For these 340 kWp system in Erfurt (GER) was carried out a due diligence with the aim to calculate the real vallue.
Power: 0,34 MWp
Client: Private Client
Gutachten, 2017, Erfurt
2017
Planning München
0,06 MWp,
Germany more
Planning München
Technical expertise of a utility scale PV power plant
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Power: 0,06 MWp
Client: Medien Licht Technik GmbH
Planung, 2017, München
2017
Expertise / damage assessment Actrees
5,0 MWp,
United Kingdom more
Expertise / damage assessment Actrees
Technical expertise of a utility scale PV power plant
Thermal imaging, I-V curve measurements and stringmeasurement were executed and evaluated to find the root causes for lower yields than expected.
Power: 5,0 MWp
Client: IB Vogt GmbH
Gutachten, 2017, Actrees
2017
Expertise / damage assessment, Tamar
5,0 MWp,
United Kingdom more
Expertise / damage assessment, Tamar
Expertise to investigate damage /fire incident root causes
Investigation of root causes and development of solutions
Power: 5,0 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2017, Tamar
2017
Expertise Folly
7,8 MWp,
United Kingdom more
Expertise Folly
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7.8 MWp was carried out in Folly (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 7,8 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Folly
2017
Expertise Nowhere
10,0 MWp,
England more
Expertise Nowhere
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10.0 MWp was carried out in Nowhere (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 10,0 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Nowhere
2017
Expertise, Sandrige
50,0 MWp,
England more
Expertise, Sandrige
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 50.0 MWp was carried out in Sandridge (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 50,0 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Sandrige
2017
Expertise, Marchington
5,0 MWp,
United Kingdom more
Expertise, Marchington
Technical expertise of a utility scale PV power plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5.0 MWp was carried out in Marchington (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as a nonconformity report was prepared.
Power: 5,0 MWp
Client: Goldbeck Solar GmbH
Betriebsführung, 2017, Marchington
2017
Due Diligence, Milkwall,
3,5 MWp,
England more
Due Diligence, Milkwall,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.5 MWp was carried out in Milkwall (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as anonconformity report was prepared.
Power: 3,5 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Milkwall
2017
Due Diligence, Carloggas,
8,3 MWp,
England more
Due Diligence, Carloggas,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 8.3 MWp was carried out in Carloggas (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as anonconformity report was prepared.
Power: 8,3 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Carloggas
2017
Due Diligence, Hurcott,
10 MWp,
England more
Due Diligence, Hurcott,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Hurcott (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as anonconformity report was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Hurcott
2017
Due Diligence, Tengore,
3,2 MWp,
England more
Due Diligence, Tengore,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.2 MWp was carried out in Tengore (UK). In particular, the following was tested on site: complete functional test of the individual strings and insulation measurement of the individual strings. Subsequently, a final report as well as anonconformity report was prepared.
Power: 3,2 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Tengore
2017
Construction Management, East,
5 MWp,
England more
Construction Management, East,
Construction of an open space PV system
For the project East Farm (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2017, East Farm
2017
Construction Management, Holly,
5 MWp,
England more
Construction Management, Holly,
Construction of an open space PV system
For the project Holly Farm (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2017, Holly Farm
2017
Construction Management, Galton Manor,
4 MWp,
England more
Construction Management, Galton Manor,
Construction of an open space PV system
For the project Galton Manor (UK) with 4 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 4 MWp
Client: IB Vogt GmbH
Bauleitung, 2017, Galton Manor
2017
Due Diligence, Whitelake
5 MWp,
England more
Due Diligence, Whitelake
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5 MWp was carried out in Whitelake (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 5 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Whitelake
2017
Due Diligence, Pylle
5 MWp,
England more
Due Diligence, Pylle
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 5 MWp was carried out in Pylle(UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 5 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Pylle
2017
Due Diligence, Upper Huntingford,
7,7 MWp,
England more
Due Diligence, Upper Huntingford,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7.7 MWp was carried out in Upper Huntingford(UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 7,7 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2017, Upper Huntingford
2017
Due Diligence, Marvel II,
3,7 MWp,
England more
Due Diligence, Marvel II,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.7 MWp was carried out in Marvel (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,7 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2017, Marvel II
2017
Due Diligence, Four Burrows,
7,7 MWp,
England more
Due Diligence, Four Burrows,
Creation of a special expertise of cable dimensioning
Power: 7,7 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2017, Four Burrows
2017
Project Management, Marienberg,
0,75 MWp,
Germany more
Project Management, Marienberg,
Construction of an open space PV system
For the project Marienberg (Germany) with 0.75 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 0,75 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2017, Marienberg
2017
Construction Management, Metzdorf,
5,0 MWp,
Deutschland more
Construction Management, Metzdorf,
Construction of an open space PV system
For the project Metzdorf (Germany) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5,0 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2017, Metzdorf
2017
Project Management, Bliesdorf,
3,6 MWp,
Germany more
Project Management, Bliesdorf,
Construction of an open space PV system
For this project at Bliesdorf (Germany) with 3.6 MWp, the contracting, construction management, project management and final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 3,6 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2017, Bliesdorf
2017
Project Management, Kunersdorf,
1,5 MWp,
Germany more
Project Management, Kunersdorf,
Construction of an open space PV system
For this project at Kunersdorf (Germany) with 1.5 MWp, the contracting, construction management, project management and final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 1,5 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2017, Kunersdorf
2017
Project Management, Möglin,
2,2 MWp,
Germany more
Project Management, Möglin,
Construction of an open space PV system
For this project at Möglin (Germany) with 2.2 MWp, the contracting, construction management, project management and final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 2,2 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2017, Möglin
2016
Yield Report, Unterempfenbach,
1,6 MWp,
Germany more
Yield Report, Unterempfenbach,
Creation of a yield report
For this 1,6 MW project in Unterempfenbach (Bavaria), a yield report was prepared based on the location, the concept and the radiation data of the environmentdieses.
Power: 1,6 MWp
Client: Hallertauer Handelshaus GmbH
Gutachten, 2016, Unterempfenbach,
2016
Yield Report, Mittersberg,
4,0 MWp,
Deutschland more
Yield Report, Mittersberg,
Creation of a yield report
For this 4 MW project in Mittersberg (Bavaria), a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 4,0 MWp
Client: Hallertauer Handelshaus GmbH
Gutachten, 2016, Mittersberg,
2016
Training, Bad Staffelstein,
Deutschland more
Training, Bad Staffelstein,
Three-day course - Topic: Electrotechnically instructed person (EuP)
The training "Electrotechnical instructed person (EuP)" was carried out for the IBC Solar AG.
Client: IBC Solar AG,
Schulungen, 2016, Bad Staffelstein
2016
Construction Management, Williamsdale,
11 MWp,
Australia more
Construction Management, Williamsdale,
Construction of an open space PV system
Für For the project Williamsdale (AUS) with 11 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 11 MWp
Client: IB Vogt GmbH
Bauleitung, 2016, Williamsdale
2016
Construction Management, Mittersberg,
4,0 MWp,
Germany more
Construction Management, Mittersberg,
Construction of the substructure and modules
For the project at Mittersberg with 4 MWp (Bavaria Germany), the contracting, construction management and the final acceptance were carried out.
Power: 4,0 MWp
Client: Montage Bau Göbel e.K.
Bauleitung, 2016, Mittersberg
2016
Construction Management, Unterempfenbach,
1,6 MWp,
Germany more
Construction Management, Unterempfenbach,
Construction of the substructure and modules
For the project at Unterempfenbach with 1.6 MWp (Bavaria Germany), the contracting, construction management and the final acceptance were carried out.
Power: 1,6 MWp
Client: Montage Bau Göbel e.K.
Bauleitung, 2016, Unterempfenbach
2016
Construction Management, Wang,
2,1 MWp,
Germany more
Construction Management, Wang,
Construction of the substructure and modules
For the project at Wang with 2.1 MWp (Bavaria Germany), the contracting, construction management and the final acceptance were carried out.
Power: 2,1 MWp
Client: Montage Bau Göbel e.K.
Bauleitung, 2016, Wang
2016
Construction Management, Öchslhof,
2,4 MWp,
Germany more
Construction Management, Öchslhof,
Construction of the substructure and modules
For the project at Oechslhof with 2.4 MWp (Bavaria Germany), the contracting, construction management and the final acceptance were carried out.
Power: 2,4 MWp
Client: Montage Bau Göbel e.K.
Bauleitung, 2016, Öchslhof
2016
Construction Management, Berg,
3,5 MWp,
Germany more
Construction Management, Berg,
Construction of the substructure and modules
For the project at Berg with 3.5 MWp (Bavaria Germany), the contracting, construction management and the final acceptance were carried out.
Power: 3,5 MWp
Client: Montage Bau Göbel e.K.
Bauleitung, 2016, Berg
2016
Planning, Fürstenfeldbruck,
0,1 MWp,
Germany more
Planning, Fürstenfeldbruck,
Specialized planning of a PV system
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Power: 0,1 MWp
Client: Medien Licht Technik GmbH
Planung, 2016, Fürstenfeldbruck
2016
Planning, Berlin,
0,02 MWp,
Germany more
Planning, Berlin,
Specialized planning of a PV system on the european patent office in Berlin
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Power: 0,02 MWp
Client: Medien Licht Technik GmbH
Planung, 2016, Berlin
2016
Project Management, Keula,
2,6 MWp,
Germany more
Project Management, Keula,
Construction of an open space PV system
For this project at Keula (Thuringia-Germany) with 2.6 MWp , the contracting, construction management, project management and final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 2,6 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2016, Keula
2016
Due Diligence, Burg,
0,2 MWp,
Germany more
Due Diligence, Burg,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 0.2 MWp was carried out in Burg (Saxony-Anhalt). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 0,2 MWp
Client: Mr. Bossen
Gutachten, 2016, Burg
2016
Due Diligence, Bournemouth,
37 MWp,
England more
Due Diligence, Bournemouth,
technische Anlagenüberprüfung einer PV Freiflächenanlage
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 37 MWp was carried out in Bournemouth (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 37 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Bournemouth
2016
Training, Weimar,
Germany more
Training, Weimar,
Three-day course - Topic: Layout of island systems
The training course "Training for Solar Consultant" was carried out for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.,
Schulungen, 2016, Weimar
2016
Due Diligence, Nowhere,
10 MWp,
England more
Due Diligence, Nowhere,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Nowhere (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Nowhere
2016
Due Diligence, Monksham,
13 MWp,
England more
Due Diligence, Monksham,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 13 MWp was carried out in Monksham (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 13 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Monksham
2016
Due Diligence, Folly,
7,8 MWp,
England more
Due Diligence, Folly,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7.8 MWp was carried out in Folly (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 7,8 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Folly
2016
Due Diligence, Sevor Farm,
10 MWp,
England more
Due Diligence, Sevor Farm,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Sevor Farm (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Sevor Farm
2016
Due Diligence, Four Burrows,
7,7 MWp,
England more
Due Diligence, Four Burrows,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7.7 MWp was carried out in Four Borrows (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 7,7 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2016, Four Burrows
2016
Due Diligence, Penare,
10 MWp,
England more
Due Diligence, Penare,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Penare (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2016, Penare
2016
Due Diligence, Egmere,
21,2 MWp,
England more
Due Diligence, Egmere,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 21.2 MWp was carried out in Egmere (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 21,2 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2016, Egmere
2016
Due Diligence, Parley Court,
24,2 MWp,
England more
Due Diligence, Parley Court,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 24.2 MWp was carried out in Parley Court (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 24,2 MWp
Client: Renewable Energy Systems Ltd
Gutachten, 2016, Parley Court
2016
Construction Management, Kickles,
5 MWp,
England more
Construction Management, Kickles,
Construction of an open space PV system
For the project Kickles near Milton Keynes (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2016, Kickles
2016
Due Diligence, Hurcott,
10 MWp,
England more
Due Diligence, Hurcott,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Hurcott (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Hurcott
2016
Due Diligence, Tengore,
3,2 MWp,
England more
Due Diligence, Tengore,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.2 MWp was carried out in Tengore (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,2 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Tengore
2016
Due Diligence, Redbridge,
10 MWp,
England more
Due Diligence, Redbridge,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Redbridge (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2016, Redbridge
2016
Construction Management, Drakelow,
5 MWp,
England more
Construction Management, Drakelow,
Construction of an open space PV system
For the project Drakelow (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2016, Drakelow
2016
Construction Management, Sandridge,
50 MWp,
England more
Construction Management, Sandridge,
Specialist site management for the construction of an open space PV system
For this project in Sandridge (UK) with 50 MWp, the specialist site management in the area of medium voltage technology was carried out. Due to its size, a substation was built next to the PV Park. The construction of the medium voltage on the part of the PV-park and the coordination with the network operator, who built the substation, was in our hands.
Power: 50 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2016, Sandridge
2015
Training, Erfurt,
Germany more
Training, Erfurt,
Three-day course - Topic: Electrotechnical Instructed Person + Occupational Safety
In co-operation with the TÜV Rheinland, the training and testing regarding occupational safety, was developed and adapted especially for the end customer ThüringerEnergienetze GmbH . The participants are specifically trained in handling photovoltaic modules and inverters as well as sensitized to dangers.
Client: TÜV Rheinland GmbH
Schulungen, 2015, Erfurt
2015
Construction Management, Actress
5 MWp,
England more
Construction Management, Actress
Construction of an open space PV system
For the project Actress (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2015, Actress
2015
Construction Management, Whitelake,
5 MWp,
England more
Construction Management, Whitelake,
Construction of an open space PV system
For the project Whitelake (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2015, Whitelake
2015
Construction Management, Pylle,
5 MWp,
England more
Construction Management, Pylle,
Construction of an open space PV system
For the project Pyllle (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2015, Pylle
2015
Due Diligence
Chile more
Due Diligence
Yield report
For this project in Chile, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Client: Goldbeck Solar GmbH
Gutachten, 2015
2015
Planning,
England more
Planning,
Coordination of a mobile measuring laboratory for the remeasurement of solar modules
For certain projects of the IB Vogt GmbH, the on-site field measurement of module performance was coordinated.
Client: IB Vogt GmbH
Planung, 2015
2015
Construction Management, Yerbeston,
5 MWp,
England more
Construction Management, Yerbeston,
Construction of an open space PV system
For the project Yerbeston (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2015, Yerbeston
2015
Due Diligence, Hirschberg,
Germany more
Due Diligence, Hirschberg,
The performance ratio for several projects in England has been calculated
The performance ratio for several projects in England has been calculated for Goldbeck Solar GmbH. Therefore the yield due to the run time has been reprocessed and checked for plausibility and calculated the PR afterwards.
Client: Goldbeck Solar GmbH
Gutachten, 2015, Hirschberg
2015
Planning, Hirschberg,
Germany more
Planning, Hirschberg,
Specialist planning of a basic proposal for medium-voltage grid connections and electric installation
For Goldbeck Solar GmbH, a sample ofcontract and tendering specificationsof medium voltage connection works were developped.
Client: Goldbeck Solar GmbH
Planung, 2015, Hirschberg
2015
Planning, Unterschleißheim,
Germany more
Planning, Unterschleißheim,
Specialized planning of a PV system on a high school
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Client: Medien Licht Technik GmbH
Planung, 2015, Unterschleißheim
2015
Planning, München,
Germany more
Planning, München,
Specialized planning of a PV system on a high school
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Client: Medien Licht Technik GmbH
Planung, 2015, Munich
2015
Due Diligence, Bodenheim,
2,22 MWp,
Germany more
Due Diligence, Bodenheim,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 2.25 MWp was carried out in Bodenheim (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 2,22 MWp
Client: SAM - Investor und Anlagenbetreiber
Gutachten, 2015, Bodenheim
2015
Due Diligence, Schwäbisch Gmünd,
0,75 MWp,
Germany more
Due Diligence, Schwäbisch Gmünd,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 750 KWp was carried out in Schwäbisch Gmünd (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,75 MWp
Client: SAM - Investor und Anlagenbetreiber
Gutachten, 2015, Schwäbisch Gmünd
2015
Due Diligence, Sibbelsdorf,
0,31 MWp,
Germany more
Due Diligence, Sibbelsdorf,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 310 kWp was carried out in Sibbelsdorf (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,31 MWp
Client: SAM - Investor und Anlagenbetreiber
Gutachten, 2015, Sibbelsdorf
2015
Due Diligence, Osternienburg,
0,42 MWp,
Germany more
Due Diligence, Osternienburg,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 422 kWp was carried out in Osternienburg (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,42 MWp
Client: SAM - Investor und Anlagenbetreiber
Gutachten, 2015, Osternienburg
2015
Due Diligence, Lorsch
0,66 MWp,
Deutschland more
Due Diligence, Lorsch
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 659 kWp was carried out in Lorsch (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,66 MWp
Client: SAM - Investor und Anlagenbetreiber
Gutachten, 2015, Lorsch
2015
Due Diligence, Alzenau
0,54 MWp,
Germany more
Due Diligence, Alzenau
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 540 kWp was carried out in Alzenau (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,54 MWp
Client: Investor und Anlagenbetreiber
Gutachten, 2015, Alzenau
2015
Due Diligence,
England more
Due Diligence,
Creation of aerial pictures for several open space plants
In preparation of the Intersolar, several aerial pictures of open space plants have been created for Goldbeck GmbH.
Client: Goldbeck Solar GmbH
Gutachten, 2015
2015
Construction Management, Ring o Bells,
5 MWp,
England more
Construction Management, Ring o Bells,
Construction of an open space PV system
For the project Ring o Bells (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: IB Vogt GmbH
Bauleitung, 2015, Ring o Bells
2015
Training, Johannesburg,
South Africa more
Training, Johannesburg,
Four-day course - Topic: Layout of island systems
The training "design and planning of island systems" was carried out in South Africa by g2kv for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2015, Johannesburg
2015
Training, Johannesburg,
South Africa more
Training, Johannesburg,
Three-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the DGS - Landesverband Thüringen in South Africa.
Client: DGS LV Thüringen e.V.
Schulungen, 2015, Johannesburg
2015
Training, Blomfontain,
South Africa more
Training, Blomfontain,
Three-day course - Topic: Construction of power plants
The training "PV power plant construction" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2015, Blomfontain
2015
Training, Cairo,
Egypt more
Training, Cairo,
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in Egypt for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2015, Cairo
2015
Training, Cairo,
Egypt more
Training, Cairo,
Three-day course - Topic: Installation of solar systems
The training "Installation of photovoltaic systems" was carried out in Egypt for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2015, Cairo
2015
Due Diligence, Dillington,
7,7 MWp,
England more
Due Diligence, Dillington,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 7.7 MWp was carried out in Dillington (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 7,7 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2015, Dillington
2015
Due Diligence, Wrangle,
10 MWp,
England more
Due Diligence, Wrangle,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Wrangle (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2015, Wrangle
2015
Due Diligence, Jordanston,
8 MWp,
England more
Due Diligence, Jordanston,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 8 MWp was carried out in Jordanston (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 8 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2015, Jordanston
2015
Due Diligence, Halse,
10 MWp,
England more
Due Diligence, Halse,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Halse (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2015, Halse
2015
Gutachten, Hurcott,
10 MWp,
England more
Gutachten, Hurcott,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 10 MWp was carried out in Hurcott (UK). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Gutachten, 2015, Hurcott
2015
Construction Management, Castle Combe,
16 MWp,
England more
Construction Management, Castle Combe,
Construction of an open space PV system
For the project Castle Combe with 16 MWp (Wiltshire-UK) the contracting, construction management and the final acceptance were carried out. In addition, the project’s planning permission process was supervised. The facility is located within a race track.
Power: 16 MWp
Client: IB Vogt GmbH
Bauleitung, 2015, Castle Combe
2014
Training, Bad Staffelstein, Göppingen, Köln,
Germany more
Training, Bad Staffelstein, Göppingen, Köln,
Three-day course - Topic: Electrotechnically instructed person (EuP)
In co-operation with the TÜV Rheinland, the training and testing regarding occupational safety, was developed and adapted especially for the end customer IBC GmbH . The participants are specifically trained in handling photovoltaic modules and inverters as well as sensitized to danger.
Client: TÜV Rheinland GmbH
Schulungen, 2014, Bad Staffelstein, Göppingen, Köln
2014
Construction Management, Hurcott,
10 MWp,
England more
Construction Management, Hurcott,
Construction of an open space PV system
For the project Hurcott (UK) with 10 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2014, Hurcott
2014
Construction Management, Tengore,
3,2 MWp,
England more
Construction Management, Tengore,
Construction of an open space PV system
For the project Tengore (UK) with 3.2 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 3,2 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2014, Tengore
2014
Due Diligence, Villiersdorp,
0,4 MWp,
South Africa more
Due Diligence, Villiersdorp,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 400 kWp was carried out in Villiersdorp (South Africa). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,4 MWp
Client: DGS LV Thüringen e.V.
Gutachten, 2014, Villiersdorp
2014
Training, Capetown,
South Africa more
Training, Capetown,
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Capetown
2014
Training, Dar Es Salaam,
Tanzania more
Training, Dar Es Salaam,
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in Tanzania for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Dar Es Salaam
2014
Training, Johannesburg,
South Africa more
Training, Johannesburg,
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in South Africafor the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Johannesburg
2014
Training, Johannesburg,
South Africa more
Training, Johannesburg,
Three-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the DGS - Landesverband Thüringenerband Thüringen in South Africa.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Johannesburg
2014
Training, Johannesburg,
South Africa more
Training, Johannesburg,
Two-day course - Topic: Installation of grid-connected solar systems
The training "Installation of grid-connected photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Johannesburg
2014
Training, La Paz,
Bolivia more
Training, La Paz,
Three-day course - Topic: Installation of solar island systems
The training course "Installation of solar island systems" was carried out for the DGS - Landesverband Thüringen in Bolivia.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, La Paz
2014
Training, El Alto,
Bolivia more
Training, El Alto,
Three-day course - Topic: Installation of grid-connected solar systems
The training "Installation of grid-connected photovoltaic systems" was carried out in Bolivia for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, El Alto
2014
Due Diligence, Coswig,
Germany more
Due Diligence, Coswig,
Counting and re-measuring of modules in the test laboratory
A performance assessment was carried out for the solar park in Coswig, as modules of different wattage classes were installed. Subsequently, a selected number of solar modules were sent to a test laboratory and flashed.
Client: ENN Group Europe GmbH
Gutachten, 2014, Coswig
2014
Due Diligence, Zwickau,
0,2 MWp,
Germany more
Due Diligence, Zwickau,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 200 kWp was carried out in Zwickau (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,2 MWp
Client: Mr. Schüren
Gutachten, 2014, Zwickau
2014
Training, Kairo
Egypt more
Training, Kairo
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in Egypt for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Cairo
2014
Training, Kairo,
Egypt more
Training, Kairo,
Three-day course - Topic: Construction of power plants
The training "PV power plant construction" was carried out in Egypt for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Cairo
2014
Training, Kairo,
Egypt more
Training, Kairo,
Three-day course - Topic: Planning of island systems
The training "planning of photovoltaic island systems" was carried out in Egypt for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2014, Cairo
2014
Construction Management, Sevor Farm,
10 MWp,
England more
Construction Management, Sevor Farm,
Construction of an open space PV system
For the project near Swindon (UK) with 10 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2014, Swindon
2014
Due Diligence, Grossbodungen,
1,9 MWp,
Germany more
Due Diligence, Grossbodungen,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 1.9 MWp was carried out in Grossbodungen (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 1,9 MWp
Client: Thüringer Energie AG
Gutachten, 2014, Grossbodungen
2013
Training, Ravensburg,
Germany more
Training, Ravensburg,
One-day course - Topic: Low Voltage Directive VDE-AR 4105 - Deutsche Bahn AG - In-house training
The training Low Voltage Directive VDE-AR 4105 was developed for TÜV Rheinland. The participants, mainly energy suppliers or network operators, were trained on reforms in the Low Voltage Directive.
Client: TÜV Rheinland GmbH
Schulungen, 2013, Ravensburg
2013
Training, Frankfurt am Main,
Germany more
Training, Frankfurt am Main,
One-day course - Topic: Low Voltage Directive VDE-AR 4105 - Deutsche Bahn AG - In-house training
The training Low Voltage Directive VDE-AR 4105 was developed for TÜV Rheinland. The participants, mainly energy suppliers or network operators, were trained on reforms in the Low Voltage Directive.
Client: TÜV Rheinland GmbH
Schulungen, 2013, Frankfurt am Main
2013
Training, Köln,
Germany more
Training, Köln,
Three-day course - Topic: Electrotechnically instructed person (EuP)
The training "Electrotechnical instructed person (EuP)" was carried out for the IBC Solar AG. The participants are specifically trained in handling photovoltaic modules and inverters as well as sensitized to dangers.
Client: TÜV Rheinland GmbH
Schulungen, 2013, Köln
2013
Training, Nürnberg,
Germany more
Training, Nürnberg,
Three-day course - Topic: Electrotechnically instructed person (EuP)
The training "Electrotechnical instructed person (EuP)" was carried out for the IBC Solar AG. The participants are specifically trained in handling photovoltaic modules and inverters as well as sensitized to dangers.
Client: TÜV Rheinland GmbH
Schulungen, 2013, Nürnberg
2013
Due Diligence, Grossbodungen,
1,9 MWp,
Germany more
Due Diligence, Grossbodungen,
Yield report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 1,9 MWp
Client: Thüringer Energie AG
Gutachten, 2013, Grossbodungen
2013
Due Diligence, Coswig2,
3,0 MWp,
Germany more
Due Diligence, Coswig2,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3 MWp was carried out in Coswig (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,0 MWp
Client: Obton A/S
Gutachten, 2013, Coswig
2013
Due Diligence, Ohrdruf,
3,3 MWp,
Germany more
Due Diligence, Ohrdruf,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.3 MWp was carried out in Ohrdruf (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,3 MWp
Client: Obton A/S
Gutachten, 2013, Ohrdruf
2013
Planning, Ohrdruf,
3,3 MWp,
Germany more
Planning, Ohrdruf,
Redesign of a plant in 4 subsystems
The 3.3 MWp plant in Ohrdruf (Germany) was to be resold, so the photovoltaic system was divided into 4 subsystems and the respective costs were determined.
Power: 3,3 MWp
Client: Obton A/S
Planung, 2013, Ohrdruf
2013
Planning, Coswig,
3,0 MWp,
Germany more
Planning, Coswig,
Redesign of a plant in 3 subsystems
The 3 MWp plant in Coswig (Saxony-Germany) was to be resold, so the photovoltaic system was divided into 3 subsystems and the respective costs were determined.
Power: 3,0 MWp
Client: Obton A/S
Planung, 2013, Coswig
2013
Planning, München,
Germany more
Planning, München,
Specialized planning of a PV system
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Client: Medien Licht Technik GmbH
Planung, 2013, Munich
2013
Planning, Leipzig,
0,08 MWp,
Germany more
Planning, Leipzig,
Specialized planning of a PV system on a church
In cooperation with the General Planner for Electrical Engineering MLT GmbH, the planning documents for the photovoltaic system were prepared and the specifications for the contracting were prepared.
Power: 0,08 MWp
Client: Medien Licht Technik GmbH
Planung, 2013, Leipzig
2013
Due Diligence, Bad Frankenhausen,
2,5 MWp,
Germany more
Due Diligence, Bad Frankenhausen,
Yield Report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 2,5 MWp
Client: DGS LV Thüringen e.V.
Gutachten, 2013, Bad Frankenhausen
2013
Construction Management, Reydon,
5 MWp,
England more
Construction Management, Reydon,
Construction of an open space PV system
For the project Reydon (UK) with 5 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 5 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Reydon
2013
Construction Management, Wrangle,
10 MWp,
England more
Construction Management, Wrangle,
Construction of an open space PV system
For the project Wrangle (UK) with 10 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 10 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Wrangle
2013
Training, Cairo,
Egypt more
Training, Cairo,
Five-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the GIZ - Gesellschaft für internationale Zusammenarbeit in Egypt.
Client: Gesellschaft für Internationale Zusammenarbeit
Schulungen, 2013, Cairo
2013
Due Diligence, Coswig1,
3,3 MWp,
Deutschland more
Due Diligence, Coswig1,
Technical system inspection of an open space plant
The 3.3 MWp plant in Coswig (Saxony-Germany) was to be resold, so a technical inspection of the ground-mounted plant was carried out. In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,3 MWp
Client: Obton A/S
Gutachten, 2013, Coswig
2013
Planning, Klinge,
0,8 MWp,
Germany more
Planning, Klinge,
Planning a solar power plant
Planning permission documents were created for the planned construction of the solar power plant with of 800 kWp in Klinge (Baden-Württemberg-Germany).
Power: 0,8 MWp
Client: Aeos Neue Energien GmbH
Planung, 2013, Klinge
2013
Planning, Hagenbuchacker,
0,99 MWp,
Germany more
Planning, Hagenbuchacker,
Planning a solar power plant
Planning permission documents were created for the planned construction of the solar power plant with of 1 MWp in Hagenbuchacker (Germany).
Power: 0,99 MWp
Client: Aeos Neue Energien GmbH
Planung, 2013, Hagenbuchacker
2013
Due Diligence, Güstrow,
2,2 MWp,
Germany more
Due Diligence, Güstrow,
Project review
Due to economic difficulties of the builder, this facility was not completed. For this reason, a technical inspection of the roof system with a total capacity of 2. 2 MWp was carried out in Güstrow (Mecklenburg-West Pomerania-Germany) in order to determine which services still have to be provided in order to put the facility into operation or to determine the value of the assets on the appointed date of the inspection. In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings and proportionate performance verification of the individual strings (characteristic curve measurement). Subsequently, a final report including report of defects was drawn up.
Power: 2,2 MWp
Client: Obton A/S
Gutachten, 2013, Güstrow
2013
Due Diligence, Remscheid,
0,042 MWp,
Deutschland more
Due Diligence, Remscheid,
Damage Expertise
Due to technical defects, a technical inspection of the roof system with a total output of 42 kWp was carried out in Remscheid. In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report includingreport of defects was drawn up.
Power: 0,042 MWp
Client: Aeos Neue Energien GmbH
Gutachten, 2013, Remscheid
2013
Due Diligence, Eisleben,
0,064 MWp,
Germany more
Due Diligence, Eisleben,
Damage Expertise
Due to technical defects, a technical inspection of the roof system with a total output of 64 kWp was carried out in Eisleben. In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report includingreport of defects was drawn up.
Power: 0,064 MWp
Client: Mrs. Sos
Gutachten, 2013, Eisleben
2013
Project Management, Redbridge,
4,3 MWp,
England more
Project Management, Redbridge,
Construction of an open space PV system
For the project Redbridge (UK) with 4,3 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 4,3 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2013, Redbridge
2013
Planning, Heidberg,
6,0 MWp,
Germany more
Planning, Heidberg,
Feasibility study for open space PV system for the industrial park Heidberg
For this project with 6 MWp in Heidberg,(Mecklenburg-Western-Pomerania-Germany) the feasibility of an economically worthwhile operation of a photovoltaic systemwas reviewed.
Power: 6,0 MWp
Client: g2kv GmbH
Planung, 2013, Heidberg
2013
Due Diligence, Bad Tennstedt,
0,06 MWp,
Germany more
Due Diligence, Bad Tennstedt,
Damage Expertise
Due to technical defects, a technical inspection of the roof system with a total output of 60 kWp was carried out in Bad Tennstedt. In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report includingreport of defects was drawn up.
Power: 0,06 MWp
Client: DGS LV Thüringen e.V.
Gutachten, 2013, Bad Tennstedt
2013
Project Management, Dillington,
7,0 MWp,
England more
Project Management, Dillington,
Construction of an open space PV system
For the project Dillington (UK) with 7 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 7,0 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2013, Dillington
2013
Due Diligence, Rastenberg,
1,3 MWp,
Germany more
Due Diligence, Rastenberg,
Yield Report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 1,3 MWp
Client: maxxsolar GmbH
Gutachten, 2013, Rastenberg
2013
Project Management, Rastenberg,
1,3 MWp,
Germany more
Project Management, Rastenberg,
Construction of an open space PV system
For the project Rastenberg (Germany) with 1.3 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.
Power: 1,3 MWp
Client: maxxsolar GmbH
Projectmanagement, 2013, Rastenberg
2013
Training, La Paz,
Bolivia more
Training, La Paz,
Five-day course - Topic: Layout of island systems in a rural area
The training course "Layout of island systems in a rural area" was carried out in Bolivia for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, La Paz
2013
Training, Weimar,
Deutschland more
Training, Weimar,
Three-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Weimar
2013
Training, Weimar,
Germany more
Training, Weimar,
Three-day course - Topic: Training for Solar Consultant
The training course "Training for Solar Consultant" was carried out for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Weimar
2013
Due Diligence, Marksuhl,
2,5 MWp,
Germany more
Due Diligence, Marksuhl,
Technical system inspection of an open space plant
Prior to the possible resale, a technical inspection of the ground-mounted plant with a total capacity of 2.5 MWp was carried out in Marksuhl (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 2,5 MWp
Client: Obton A/S
Gutachten, 2013, Marksuhl
2013
Due Diligence, Frauendorf,
1,0 MWp,
Germany more
Due Diligence, Frauendorf,
Technical system inspection of an open space plant
Prior to a possible resale, a technical inspection of the ground-mounted plant with a total capacity of 1 MWp was carried out in Frauendorf (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 1,0 MWp
Client: Obton A/S
Gutachten, 2013, Frauendorf
2013
Due Diligence, Bernsdorf,
1,31 MWp,
Germany more
Due Diligence, Bernsdorf,
Technical system inspection of an open space plant
Prior to a possible resale, a technical inspection of the ground-mounted plant with a total capacity of 1.31 MWp was carried out in Bernsdorf (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 1,31 MWp
Client: Obton A/S
Gutachten, 2013, Bernsdorf
2013
Due Diligence, Weissig,
0,83 MWp,
Germany more
Due Diligence, Weissig,
Technical system inspection of an open space plant
Prior to a possible resale, a technical inspection of the ground-mounted plant with a total capacity of 830 kWp was carried out in Weissig (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 0,83 MWp
Client: Obton A/S
Gutachten, 2013, Weissig
2013
Due Diligence, Marzahna,
0,75 MWp,
Germany more
Due Diligence, Marzahna,
Technical system inspection of an open space plant
Prior to a possible resale, a technical inspection of the ground-mounted plant with a total capacity of 750 kWp was carried out in Marzahna (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 0,75 MWp
Client: Obton A/S
Gutachten, 2013, Marzahna
2013
Due Diligence, Capetown,
0,7 MWp,
South Afrika more
Due Diligence, Capetown,
Building a model system and instruction of the skilled workings
A Model PV-System was build and the right installation was instructed to the skilled workers.
Power: 0,7 MWp
Client: Aurora Power Solution Ltd.
Gutachten, 2013, Capetown
2013
Due Diligence, Gießen,
3,5 MWp,
Germany more
Due Diligence, Gießen,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 3.5 MWp was carried out in Gießen (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 3,5 MWp
Client: DGS LV Thüringen e.V.
Gutachten, 2013, Gießen
2013
Due Diligence, Rittersdorf,
1,0 MWp,
Germany more
Due Diligence, Rittersdorf,
Yield Report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 1,0 MWp
Client: DGS LV Thüringen e.V.
Gutachten, 2013, Rittersdorf
2013
Training, La Paz,
Bolivia more
Training, La Paz,
Four-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the DGS - Landesverband Thüringen in Bolivia.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, La Paz
2013
Due Diligence, Kayhude,
1,0 MWp,
Germany more
Due Diligence, Kayhude,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 1.0 MWp was carried out in Kayhude (Schleswig-Holstein Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 1,0 MWp
Client: Werraenergie GmbH,
Gutachten, 2013, Kayhude
2013
Construction Management, Dettingen,
1,0 MWp,
Germany more
Construction Management, Dettingen,
Construction of a rooftop system
For the roof project in Dettingen (Baden-Wuerttemberg-Germany) with 1 MWp, the contracting, construction management and the final acceptance were carried out.
Power: 1,0 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Dettingen
2013
Construction Management, Dornstadt,
1,0 MWp,
Germany more
Construction Management, Dornstadt,
Construction of a rooftop system
For the roof project in Dornstadt (Germany) with 1 MWp, the contracting, construction management and the final acceptance were carried out.
Power: 1,0 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Dornstadt
2013
Construction Management, Ebensfeld,
1,0 MWp,
Germany more
Construction Management, Ebensfeld,
Construction of a rooftop system
For the roof project in Ebensfeld (Germany) with 1 MWp, the contracting, construction management and the final acceptance were carried out.
Power: 1,0 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Ebensfeld
2013
Construction Management, Malsch,
1,0 MWp,
Germany more
Construction Management, Malsch,
Construction of a rooftop system
For the roof project in Malsch (Germany) with 1 MWp, the contracting, construction management and the final acceptance were carried out.
Power: 1,0 MWp
Client: Goldbeck Solar GmbH
Bauleitung, 2013, Malsch
2013
Due Diligence, Gießen,
3,5 MWp,
Germany more
Due Diligence, Gießen,
Yield Report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 3,5 MWp
Client: maxxsolar GmbH
Gutachten, 2013, Gießen
2013
Construction Management, Franschoek,
0,7 MWp,
South Africa more
Construction Management, Franschoek,
In process supervision of the construction of an open space PV system
In process supervision of the construction of an 0,7 MWp open space PV system for DGS - Landesverband Thüringen was carried out in Südafrika.
Power: 0,7 MWp
Client: DGS LV Thüringen e.V.
Bauleitung, 2013, Franschoek
2013
Training, Capetown,
South Africa more
Training, Capetown,
Two-day course - Topic: Installation of grid-connected solar systems
The training "Installation of grid-connected photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Capetown
2013
Training, Bloemfontein,
South Africa more
Training, Bloemfontein,
Two-day course - Topic: Installation of grid-connected solar systems
The training "Installation of grid-connected photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Bloemfontein
2013
Training, Bloemfontein,
South Africa more
Training, Bloemfontein,
Two-day course - Topic: Design and planning of grid-connected solar systems
The training "design and planning of grid-connected photovoltaic plants" was carried out in South Africa by g2kv for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Bloemfontein
2013
Training, Bloemfontein,
South Africa more
Training, Bloemfontein,
Two-day course - Topic: Basics of photovoltaic technology
The training "Basics of photovoltaic technology" was carried out in South Africa by g2kv for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Bloemfontein
2013
Training, Durban,
South Africa more
Training, Durban,
Two-day course - Topic: Installation of grid-connected solar systems
The training "Installation of grid-connected photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2013, Durban
2012
Training, Hamburg
Germany more
Training, Hamburg
One-day course - Topic: Low Voltage Directive VDE-AR 4105
The training Low Voltage Directive VDE-AR 4105 was developed for TÜV Rheinland. The participants, mainly energy suppliers or network operators, were trained on reforms in the Low Voltage Directive.
Client: TÜV Rheinland GmbH,
Schulungen, 2012, Hamburg
2012
Training, Köln,
Germany more
Training, Köln,
One-day course - Topic: Low Voltage Directive VDE-AR 4105
The training Low Voltage Directive VDE-AR 4105 was developed for TÜV Rheinland. The participants, mainly energy suppliers or network operators, were trained on reforms in the Low Voltage Directive.
Client: TÜV Rheinland GmbH,
Schulungen, 2012, Köln
2012
Project Management, Ifta,
0,6 MWp,
Germany more
Project Management, Ifta,
Construction of an open space PV system
For this project at Ifta with 0.6 MWp (Thuringia-Germany) the preliminary planning, planning, tendering, contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised<s> </s>and all necessary and network connection relevant documents were obtained.
Power: 0,6 MWp
Client: maxxsolar GmbH
Projectmanagement, 2012, Ifta
2012
Project Management, Gießen,
3,5 MWp,
Deutschland more
Project Management, Gießen,
Errichtung einer Freiflächen PV-Anlage
For this project at Gießen with 3.5 MWp (Germany) the preliminary planning, planning, tendering, contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised<s> </s>and all necessary and network connection relevant documents were obtained.
Power: 3,5 MWp
Client: maxxsolar GmbH
Projectmanagement, 2012, Gießen
2012
Project Management, Horsacott,
7,0 MWp,
England more
Project Management, Horsacott,
Construction of an open space PV system
For this project at Horsacott with 7 MWp (UK) the preliminary planning, planning, tendering, contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised<s> </s>and all necessary and network connection relevant documents were obtained.
Power: 7,0 MWp
Client: Goldbeck Solar GmbH
Projectmanagement, 2012, Horsacott
2012
Due Diligence, Eussenheim,
2,9 MWp,
Germany more
Due Diligence, Eussenheim,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 2.9 MWp was carried out in Eussenheim (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 2,9 MWp
Client: Schneider GmbH,
Gutachten, 2012, Eussenheim
2012
Due Diligence, Tüngen,
1,0 MWp,
Deutschland more
Due Diligence, Tüngen,
Glint and glare expertise
For this project, a glare report was created to ascertain that there is no serious restriction to rail traffic and the residents.
Power: 1,0 MWp
Client: Schneider GmbH,
Gutachten, 2012, Tüngen
2012
Due Diligence, Wiesenfeld,
2,5 MWp,
Germany more
Due Diligence, Wiesenfeld,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 2.5 MWp was carried out in Wiesenfeld (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 2,5 MWp
Client: Schneider GmbH,
Gutachten, 2012, Wiesenfeld
2012
Due Diligence, Meiningen,
8,0 MWp,
Germany more
Due Diligence, Meiningen,
Land valuation for the sale of a LEG property for a solar power plant
For this project, a land value survey was drawn up to determine the purchase price for a possible solar power plant.
Power: 8,0 MWp
Client: LEG Thüringen GmbH
Gutachten, 2012, Meiningen
2012
Training, Weimar,
Germany more
Training, Weimar,
Three-day course - Topic: Training for Solar Consultant
The training course "Training for Solar Consultant" was carried out for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2012, Weimar
2012
Due Diligence, Karlstadt
6,5 MWP,
Germany more
Due Diligence, Karlstadt
Yield report Karlstadt
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 6,5 MWP
Client: Schneider GmbH,
Gutachten, 2012, Karlstadt
2012
Due Diligence, Dingelstädt,
0,01 MWp,
Germany more
Due Diligence, Dingelstädt,
Damage assessment of delaminated thin-film modules
A damage assessment has been prepared for this project due to the delamination of the thin film modules.
Power: 0,01 MWp
Client: Mr. Eckart
Gutachten, 2012, Dingelstädt
2012
Planning, Livingstone,
0,01 MWp,
Sambia more
Planning, Livingstone,
Design of a self-sufficient PV-System for a hotel
For this project, a self-sufficient PV-System was designed for a hotel.
Power: 0,01 MWp
Client: Kolb Ripke Architekten
Planung, 2012, Livingstone
2012
Planning, Vacha,
1,0 MWp,
Germany more
Planning, Vacha,
Feasibility study for open spaces PV system for the landfill Vacha
For this project, the potentiality to achieve an economically meaningful operation of a photovoltaic system was reviewed.
Power: 1,0 MWp
Client: Werraenergie GmbH,
Gutachten, 2012, Vacha
2012
Due Diligence, Erfurt,
2,0 MWp,
Germany more
Due Diligence, Erfurt,
Technical system inspection of an open space plant
Prior to the expiry of the warranty period, a technical inspection of the ground-mounted plant with a total capacity of 2 MWp was carried out in Erfurt (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including areport of nonconformity was prepared.
Power: 2,0 MWp
Client: maxxsolar GmbH
Gutachten, 2012, Erfurt
2012
Training, Erfurt,
Germany more
Training, Erfurt,
One-day course - Topic: Construction of power plants
The training "PV power plant construction" was carried out in for the Evangelische Erwachsenenbildung Thüringen.
Client: Evangelische Erwachsenenbildung Thüringen
Schulungen, 2012, Erfurt
2012
Training, Köln,
Germany more
Training, Köln,
Three-day course - Topic: Low Voltage Directive VDE-AR 4105
The training Low Voltage Directive VDE-AR 4105 was implemented for TÜV Rheinland.
Client: TÜV Rheinland GmbH,
Schulungen, 2012, Köln
2012
Due Diligence, Breitung,
1,0 MWp,
Germany more
Due Diligence, Breitung,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 1.0 MWp was carried out in Breitung (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 1,0 MWp
Client: Werraenergie GmbH,
Gutachten, 2012, Breitung
2012
Due Diligence, Lastrup,
0,22 MWp,
Germany more
Due Diligence, Lastrup,
Technical inspection of a rooftop system
Prior to the expiry of the 2-year warranty period, a technical inspection of the roof system with a total capacity of 220 kWp was carried out in Lastrup (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 0,22 MWp
Client: RAL Gütegemeinschaft Solar
Gutachten, 2012, Lastrup
2012
Training, Pretoria,
South Africa more
Training, Pretoria,
Three-day course - Topic: Planning of PV systems
The training "planning of photovoltaic systems" was carried out in South Africa for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2012, Pretoria
2012
Training, Weimar,
Germany more
Training, Weimar,
Three-day course - Topic: Layout of island systems
The training course "Layout of island systems" was carried out for the DGS - Landesverband Thüringen.
Client: DGS LV Thüringen e.V.
Schulungen, 2012, Weimar
2012
Due Diligence, Erfurt,
2,0 MWp,
Germany more
Due Diligence, Erfurt,
Yield report Erfurt
For this project in Erfurt, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 2,0 MWp
Client: maxxsolar GmbH
Gutachten, 2012, Erfurt
2012
Due Diligence, Nohra,
0,6 MWp,
Germany more
Due Diligence, Nohra,
Yield report
For this project, a yield report was prepared based on the location, the concept and the radiation data of the environment.
Power: 0,6 MWp
Client: maxxsolar GmbH
Gutachten, 2012, Nohra
2012
Due Diligence, Tombeboeuf,
4,5 MWp,
France more
Due Diligence, Tombeboeuf,
Technical Equipment Check - Thermographic Images
Thermal images were takenin line with the warranty management for this project.
Power: 4,5 MWp
Client: OstEnergy Ltd.
Gutachten, 2012, Tombeboeuf
2012
Planning, Berlin,
60.000 m²,
Germany more
Planning, Berlin,
Feasibility study for the construction of a PV system at Berlin Tempelhof Airport
For this project with 0.3 MWp, a feasibility study was prepared. Among other things, the roof conditions and the consumption of the airport building were used as reference values.
Power: 60.000 m²
Client: Kolb Ripke Architekten
Planung, 2012, Berlin
2012
Project Management, Nohra,
0,6 MWp,
Germany more
Project Management, Nohra,
Construction of an open space PV system
For this project at Nohra with 0.6 MWp (Thuringia-Germany) the preliminary planning, planning, tendering, contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised<s> </s>and all necessary and network connection relevant documents were obtained.
Power: 0,6 MWp
Client: maxxsolar GmbH
Projectmanagement, 2012, Nohra
2012
Training
Germany more
Training
One-day course - Topic: Sources of errors on PV-Systems
The training Low Sources of errors on PV-Systems was implemented for TÜV Rheinland in the following citys: Städten: Frankfurt am Main, Erfurt, Marbach, Berlin, München, Nürnberg, Hannover, Hamburg
Client: TÜV Rheinland GmbH
Schulungen, 2012, Frankfurt am Main, Berlin, München, Nürnberg, Hannover, Erfurt
2012
Due Diligence, Kirchenlamitz,
1,2 MWp,
Germany more
Due Diligence, Kirchenlamitz,
Technical inspection of a four rooftop systems
Prior to the expiry of the 2-year warranty period, a technical inspection of four rooftop systems with a total capacity of 1.2 MWp was carried out in Kirchenlamitz (Germany). In particular, the following was tested on site: complete functional test of the individual strings, insulation measurement of the individual strings, proportionate performance verification of the individual strings (characteristic curve measurement) as well as proportionate testing of the solar modules by means of thermography. Subsequently, a final report including report of defects was drawn up.
Power: 1,2 MWp
Client: CW Consult GmbH
Gutachten, 2012, Kirchenlamitz
2012
Project Management, Erfurt,
2,0 MWp,
Germany more
Project Management, Erfurt,
Construction of an open space PV system
For the project Erfurt (Germany) with 2 MWp, the contracting, construction management and the final acceptance were carried out. Additionally, the project’s planning permission process was supervised.